Connect with us

News

FG Announces Closure Of First River Niger Bridge For One Week

Published

on

The Federal Government on Friday announced the closure of the River Niger bridge for one week.

The closure is to carry out repairs on the vandalised sections of the River Niger bridge road and install security architecture in the area.

Minister for Works, Engr Dave Umahi, disclosed this at Ogbunike in Oyi Local Government Area of Anambra during an inspection tour of the bridge and other roads under construction in the South East and South South geopolitical zones of the country.

Advertisement

The bridge is over 50 years old after its construction.

He said motorists would, at the closure of the bridge, be directed to the Second Niger Bridge in order to give the contractors an adequate time frame to carry out the necessary repairs.

READ ALSO: FAAC: FG, States, LGs Share N3.007trn July Revenue

Advertisement

Recall that suspected vandals had looted vital bolts and irons used in the construction of the bridge, thereby exposing the bridge to obvious collapse and, in the process, threatening the lives of millions of road users and passersby.

He explained that security measures are being taken to avert a repeat occurrence of vandalism on the bridge.

“Bridges are designed for light load and dynamic loads so we have directed that work should start immediately and the entire ashfalt be removed and put another one and there will be solar lights on that bridge in the next one week and we shall fix CCTV and connect it to the one in the 2nd Niger Bridge so that security will observe and whoever that tries to touch the bridge again is going to be arrested.

Advertisement

“Now on the first Niger bridge, we have seen the wickedness of the underworld. We have seen the man’s inhumanity to man , those things that they are removing is very dangerous to the beauty of that bridge and we have commenced action on that bridge,” he said.

He added; “There is so much accumulated workload on that bridge, like it was with the 3rd Mainland Bridge, and every government that comes will put asphalt, and it is causing a lot of gridlock on that bridge.

READ ALSO: How To Apply: FG Reopens Portal For Nigerians To Obtain N50,000 Grant

Advertisement

“So these are the actions that we have taken and then getting down we came to the Enugu – Onitsha express and the are working in three sections and there the Enugu -Onitsha and another one is 17.5 km and the last one is about 20km by two and so I have directed them not to start any asphalt work or concrete work so what they are to do is to take measurements of all the failed sections and it should be milled out and then use 16mm binder to cover them very well all the way from head bridge to 21.5 km and they will finish one carrage way before they go to the other one.

“We have to attempt to work at night so that we don’t interfare with traffic and we have to get the road safety involved and our own local traffic managers they should commence the desealting of the drainage before commencing”

“To that effect we may have to close down the first Niger bridge in seven days time and we direct traffic to the second Niger bridge for us to fix the first Niger bridge in good time ” he stated.

Advertisement

At the ongoing construction of the second Niger Bridge access road, Engr Timothy Emenike, Controller, and Engr Nnamdi explained that there would be no more slow pace of work on the project, adding that the project is being executed from both fronts in order to beat the deadline.

“The project starts from Obosi down to Mkpor and Ogidi and now we are in Ogbunike and along this alignment between the last time you came we are working on several stops along this alignment and you have just seen the second bridge that is on going and we are almost about to start the third one”.

READ ALSO: FG Revives 16 Abandoned Unity College E-libraries

Advertisement

“Work pace will not be a hindrance until we exhaust what was given to us by the Anambra state government and I am happy to inform you that since the new Commissioner took over we have been going to the new Commissioner’s office and have been pressuring him to give us more work space “

According to him, “in the next week we shall have another work space of 5km between Obosi axis, working from both ends “

“We are cutting through the hill at Ogbunike to continue the work in that area,” they stated.

Advertisement

Anambra State Commissioner for Works, Arc Okey Ezeobi, announced that the right of way being demanded by the contractors would be granted to them, adding that an additional 5km has been added to the contractors.

Ezeobi thanked President Ahmed Bola Tinubu and Engr Dave Umahi for providing democracy dividends for the people of Anambra and the South East.

READ ALSO: Atiku Reacts To FG’s Suspension Of WAEC, NECO Fees Hike

Advertisement

He reiterated the support of the people of the state ahead of the 2027 general elections.

“There is no better way to describe this as a renewed hope and not fit saying it and the Hon Minister with what you are doing with our wonderful President for the first time Easterners can come in and move out with ease and the bottle neck they had been a great harassment and that is sending people out of the South East has been taken care of “

“One can now bye pass Onitsha bye pass Asaba and you are on your way”.

Advertisement

“You don’t know how glad the people of Anambra and the South East is and thank Mr President for us “

“There is no way to asked for democracy dividend they this and that is when you have a visionary leadership tailored towards aliviating the sufferings of the masses “

“Mr President is developing every parts of Nigeria and regarding the right of way for this project , we are finalizing it and we are adding another 5km to what we have now and there will be more than enough for the contractor to work with ” he added.

Advertisement

News

Group Commends COREN For Training Engineers In Engineering Failure, Forensic Investigation In Nigeria

Published

on

By

Foundation for the Development of Shira Community (FODESCO) in Shira Local Government Area of Bauchi state has commended the Council for the Regulation of Engineering in Nigeria (COREN) for conducting a pioneer training on Engineering Failure and Forensic Investigation (EFFI) for 50 licensed engineering practitioners across the country.

Engr. Shehu Wakili, the Chairman of the Foundation made the commendation in an interview with newsmen on Friday.

According to him, the training which was conducted by COREN in collaboration with the Nigerian Building and Road Research Institute (NBRRI) and the Chartered Institute of Forensic and Certified Fraud Investigators of Nigeria (CIFCFIN), was to equip engineers and professionals from academia, industry, and government MDAs with practical skills to investigate infrastructure failures and prevent recurring building collapses.

Advertisement

READ ALSO: ICPC, COREN Working To Curb Quackery In Engineering — Don

He added that the training was also to build a pool of trained specialists who could investigate building collapses and other engineering failures, determine their root causes, and recommend measures to prevent recurrence, saying that the trainees would form part of a register of trained and certified forensic engineering investigators.

He further lauded COREN for the subsequent induction of its member, Engr. Abdullahi Muhammad MNSE, who among the 50 participants, hails from Bauchi state as a Chartered Engineering Forensic and Failure Investigator (CEFFI), certified by CIFCFIN.

Advertisement

“FODESCO is proud of him and wishes him well in all his endeavours”, he prayed.

Wakili, also the Chairman, Nigerian Society of Engineers (NSE), Bauchi state chapter, revealed that the training covered failure analysis, forensic investigation methodologies, risk assessment, and professional reporting.

“This initiative supports broader efforts by COREN and the National Assembly to enforce stricter building codes, identify quackery, and ensure accountability across the construction sector,” he said.

Advertisement
Continue Reading

News

NBS: Lagos, Rivers, Enugu Top List As States Generated N5.15trn In 2025

Published

on

By

The National Bureau of Statistics (NBS) has disclosed that 36 states and the FCT generated a total of ₦5.15 trillion in 2025, indicating a growth rate of 40.93 percent from ₦3.65 trillion recorded in 2024.

NBS stated on Thursday citing the Nigeria Revenue Service ( NRS) as source of its information that Lagos emerged top on the list of states with the highest revenue generation in the sum of ₦1.77 trillion.

“Followed by Rivers state ₦428.42 billion and Enugu with IGR record of ₦406.77 billion in the period referenced.”

Advertisement

The. Bureau said Yobe, Ebonyi and Sokoto states reported the least revenues with ₦16.01 billion, ₦17.18 billion and ₦20.48 billion, respectively.

READ ALSO: Trump Bans CNN, Others From White House Coverage, Gives Reason

According to NBS, Pay As You Earn (PAYE) was the most tax revenue recorded during the period, valued at ₦2.64 trillion, representing 69.51 percent of the total tax revenue collected, while capital gains tax was the least with ₦12.40 billion while the share of total tax revenue to total IGR was 73.64 percent nationally.

Advertisement

“Other states and their share of IGR are FCT – N356.34 billion, Ogun – N252.36 billion, Delta – N202.49 billion, Edo – N132.21 billion, Oyo – N103.25 billion and Kano – N102.26 billion.

“Ten other states in lowest category of IGR include Yobe – N16.01 billion, Ebonyi – N17.18 billion, Sokoto – N20.48 billion, Taraba – N28.16 billion ; Benue – N29.57 billion, Zamfara – N30.07 billion, Kebbi – N31.23 billion, Nasarawa – N32.57 billion, Adamawa – N33.76 billion andcBorno – N36.36 billion “.

READ ALSO: Nigeria’s Economy Grew By 3.13% In Q1 2025 — NBS

Advertisement

NBS noted that the states generated their most and least revenue from taxes and other government sources. “PAYE was the dominant revenue source nationally, generating N2.64 trillion and accounting for 69.51% of total tax revenue for the year.

“Other sources included direct assessment, road taxes, stamp duties, withholding taxes and capital gains tax, which was the smallest contributor at N12.40 billion,” the Bureau stated.

Advertisement
Continue Reading

News

Osun Police Arrest Suspect In Emir Ajagungbade’s Murder Probe

Published

on

By

The Osun State Police Command has reportedly arrested Waliyi Adejare, popularly known as Jay Jay, at Oke Baale area of Osogbo, Osun State, as part of an investigation into the circumstances surrounding the murder of Lekan Oyeyemi, popularly known as Emir Ajagungbade.

Adejare was reportedly taken into police custody on Thursday. Sources familiar with the development described him as one of the suspects being investigated in connection with the killing, which occurred amid the crisis that has continued to trail activities around motor parks in Osun State.

However, the police have cautioned against conclusively linking the suspect to the murder at this stage, stressing that investigations into both his arrest and the killing are still ongoing.

Advertisement

The Police Public Relations Officer in Osun State, Abiodun Ojelabi, who confirmed the arrest, said it was too early to establish whether Adejare was arrested specifically in connection with the murder of Emir.

READ ALSO: Osun Park Crisis: Gunshots Rock Osogbo As Emir Ajagungbade Shot Dead In Ile-Ife

Ojelabi said the command was still conducting a thorough investigation to establish the circumstances surrounding the suspect’s arrest and determine whether or not he had any connection with the killing.

Advertisement

According to him, the police would make their findings public after the completion of the investigation, urging members of the public to await the outcome of the ongoing process rather than relying on unverified claims concerning the suspect.

Reliable information obtained on the development indicated that Adejare, also known as Jay Jay, was apprehended in the Oke Baale area of Osogbo during an operation by the police on Thursday.

READ ALSO: Osun: Jonathan Frowns At Govs, Others Converging On States During Off-cycle Elections

Advertisement

Sources also alleged that Adejare had previously served in the Nigerian Navy before reportedly leaving the service and subsequently becoming associated with individuals suspected of criminal activities in Osogbo and its environs.

The latest arrest comes against the backdrop of heightened security attention following the killing of Emir, which triggered renewed concerns over violence and rival interests surrounding motor park operations in the state.

Following the incident, the state government announced measures affecting the activities of the National Union of Road Transport Workers, NURTW, while the police commenced investigations into the circumstances surrounding the killing and other developments arising from the crisis.

Advertisement
Continue Reading

Trending

Exit mobile version