Connect with us

News

JUST IN: FG Bans Use Of Laterite For Road Construction

Published

on

The Minister of Works, Senator David Umahi, has announced a ban on the use of laterite as a base in road construction.

He directed that henceforth, contractors should use lumps, sharp sand and stone base to form the base before laying of concrete or asphalt pavement.

Advertisement

The Minister gave this directive while inaugurating a committee for the supervision of the Reconstruction of Benin – Warri dual carriageway and the dualization of East – West Road, Port Harcourt – Onne Port junction road in River State.

This was contained in a statement signed by the Director (Information), Press and Public Relations of the Ministry, Lere-Adams Blessing, in Abuja, on Friday.

According to her, Umahi noted that laterite has a limited load bearing capacity, susceptible to erosion and weathering especially in areas with heavy rainfall and this can lead to degradation of the road surface overtime, maintenance challenge and does not last long.

Advertisement

READ ALSO: Edo 2024: Why I Am Aspiring On The Platform Of LP – Akpata, Ex-President, NBA

She quoted the Miniater as saying, “We are giving very serious attention to the roads between Benin and Warri. The road between Eleme and Onne Port, we are mindful of the site conditions of these roads, the water conditions and the boreholes instead of pot holes on these roads.

“No more laterite, contractors are now to use lumps, sharp sand and stone base in place of laterite”

Advertisement

The Minister also directed the newly inaugurated Road Taskforce Team that there must be a continuous maintenance of all the roads under construction until the end of the project.

He enjioned them to ensure that the contractors are duly informed of the development, and that they should remember that the ministry is under a matching order given by Mr. President, to fix Nigerian roads for the citizens to have ease of movement from one location to the other.

READ ALSO: Police Arrest 2 Over Romance Scam In Abuja

Advertisement

Umahi said, “The committee must implement the contract agreement with maintenance culture as key. Committee members are to monitor the contractors closely to make sure things are done right.

“Our contractors can now understand that we are not insisting that things have to change without a reason, but that the society is demanding for sustainability and integrity of the work they are doing”.

Umahi disclosed that road infrastructure is one of the key factors for the revolution of our commerce, education, security and power in this country and that Mr. President is committed to our road infrastructure improvement and thus the Ministry is on a mission to uphold the renewed hope agenda of this administration on road infrastructure provision.

Advertisement

“I want to say that road infrastructure is one of the key factors for the revolution of our commerce, education, security and power in this country and Mr President is committed to our road infrastructure, so we are on a mission and we must take back our country,”
He added.

READ ALSO: JUST IN: Naira Marley Arrives Lagos To Assist In MohBad’s Death Probe

The Minister equally mandated the committee to ensure daily proper supervision and documentation of what the contractors are doing and that they must ensure the new methods of construction are followed including maintenance because it is part of the elements of the project and anything contrary to this will attract appropriate sanctions.

Advertisement

Umahi said, “We are not at war with the contractor but contractors should not put the public to suffering. Proper daily supervision and documention of what the contractor is doing is compulsory.

“They must ensure the new method of construction is followed and maintenance follows too because it is part of the elements of the contract and any offence is punishable.”

Umahi ordered that contracts must be stable; no variation (VOP) on the contract will be accepted.

Advertisement

He charged the contractors using asphalt pavement to ensure that their contracts are stable, sustainable and can stand the test of time and warned that the ministry will not go to Federal Executive Council (FEC) to ask for increment because of the fluctuating price of bitumen, insisting that the ministry will not go beyond the N6trillion set aside for the ongoing projects completion.

READ ALSO: Obaseki Warns Against Politics Of Lies, Manipulation

He also said, “Those contractors using asphalt concrete and have achieved 80 percent completion can go ahead but no cost variation because I cannot be going to the National Assembly on weekly basis asking them for increment of contract sum”

Advertisement

The Minister added that before mobilization fund can be released to any contractor, the contractor must have mobilized 50% of its equipment and personnel to site.

He noted that the ministry will respect the rights of contractors and contractors have to also respect the right of the citizens.

Meanwhile, the committees constituted are as follows :
Reconstruction of Benin-Warri Dual Carriageway (Section 1 : By Levant Construction Company Ltd)
Engr. C. Oke, Deputy Director HSSI; Engr. B. W. Hassan; Representative of the Honourable Minister; Representative of Highways MG&QC; Representative of Human Resources Department, FMW; Representative of Legal Department, FMW ; Representative of COREN; Representative of NSE. Among others.

Advertisement

News

PHOTOS: Brazil Welcomes Tinubu With Full Military Honours In Brasília

Published

on

By

Brazil on Monday rolled out full military honours at the Planalto Palace in Brasília to receive President Bola Tinubu.

Tinubu’s Special Adviser on Information and Strategy, Bayo Onanuga, disclosed this on X on Monday.

Advertisement

READ ALSO:Tinubu Signs Direct Flight, Other Agreements With Brazil

Onanuga said Tinubu was welcomed by his host, President Luiz Inácio Lula da Silva.

Onanuga said Tinubu was welcomed by his host, President Luiz Inácio Lula da Silva.

Advertisement

He wrote, “More photos of the official reception for President Tinubu at the Planalto Palace in Brasília, Monday, August 25, 2025. Brazil’s President Luiz Inácio Lula da Silva welcomed President Bola Tinubu with full military honours.”

Advertisement
Continue Reading

News

Tinubu Signs Direct Flight, Other Agreements With Brazil

Published

on

By

President Bola Ahmed Tinubu has signed a landmark Bilateral Air Service Agreement with Brazil, signalling the establishment of direct air links between Nigeria and South America’s largest economy.

The agreement was formalised on Monday during Tinubu’s official state visit to Brasília.

Advertisement

Media aide to the minister, Tunde Moshood, made this known through a statement, made available to The PUNCH.

At the signing ceremony which was witnessed by Messrs Nigerian President, Tinubu and the Brazilian President Luiz Inácio Lula da Silva in Brasilia also had the Nigeria’s Minister of Aviation and Aerospace Development, Festus Keyamo, signed the agreement on behalf of Nigeria, while Brazil’s Minister of Transport, Silvio Costa Filho, also signed for the host country.

READ ALSO:2027: You Will Lose 80% Of Northern Muslim Votes If…, APC Forum Warns Tinubu

Advertisement

The BASA creates a new framework for direct flights between Nigeria and Brazil, with the potential to significantly enhance trade, tourism, investment, and diplomatic relations.

The statement further noted that, “ It also marks a key step in Nigeria’s broader efforts to strengthen international partnerships and improve global connectivity.”

Tinubu had arrived in Brazil with a delegation that included Minister of Finance and Coordinating Minister of the Economy, Wale Edun; Minister of State for Foreign Affairs, Bianca Ojukwu; Minister of Agriculture and Food Security, Abubakar Kyari; and other senior government officials.

Advertisement

According to the statement, the Brazilian President welcomed the agreement, expressing his administration’s commitment to expanding cooperation with Nigeria in sectors such as aviation, agriculture, and infrastructure.

READ ALSO:Monarch’s Suspension Sparks Crisis In Delta

He described the BASA as a reflection of the strong ties between both countries and an opportunity to deepen economic and cultural collaboration.

Advertisement

Tinubu is also scheduled to hold meetings with key Brazilian government officials, including the President of the Senate, the President of the Chamber of Deputies, and the President of the Supreme Federal Court.

The two-day visit will include high-level discussions between Nigerian and Brazilian delegations across various sectors, as both nations explore opportunities for mutual growth and development.

The statement reads, “The ongoing state visit will also see President Tinubu meeting the President of the Brazilian Senate at the National Congress, the President of the Chamber of Deputies, and the President of the Supreme Federal Court.

Advertisement

“The working visit, which continues tomorrow, will also feature high-level engagements between Nigerian and Brazilian delegations across various sectors, underscoring both nations’ commitment to building a future of mutual growth and prosperity.”

Advertisement
Continue Reading

News

NAFDAC Warns Of Fake Postinor-2 In Circulation

Published

on

By

The National Agency for Food and Drug Administration and Control on Monday issued a public alert, warning the public about confirmed counterfeit batches of Postinor-2 (Levonorgestrel 0.75 mg) now circulating in Nigeria.

The alert follows a report from the Society for Family Health, the marketing authorisation holder, confirming that they did not import the suspect batches.

Advertisement

Postinor-2 (Levonorgestrel 0.75mg) is a brand of emergency contraceptive pill containing the active ingredient levonorgestrel.

NAFDAC revealed there are noticeable labelling discrepancies between the authentic and fake products.

READ ALSO:NAFDAC Warns On Recalled U.S. Supplements

Advertisement

It said, “The National Agency for Food and Drug Administration and Control (NAFDAC) hereby notifies the public of falsified Type 1 and 2 batches of POSTINOR 2 (Levonorgestrel 0.75mg) product in circulation.

“The noticeable difference was found to be as follows: The font size of the text on the pin verification sticker appears smaller and has a wrong spelling of the word Veify instead of Verify on the fake; meanwhile, the text font on the sticker of the original appears bigger and more visible. There is also a wrong spelling behind the pack of the fake “Distnibuted in Nigeria” instead of distributed in Nigeria”, NAFDAC said.

NAFDAC identified the original Postinor-2 as batch T32458H, manufactured in February 2023 with an expiry date of February 2027 and registration number 04-6985.

Advertisement

READ ALSO:NAFDAC Uncovers Warehouse Loaded With Explosive Chemicals In Kano

The agency, however, confirmed two falsified versions: Counterfeit Product (Type 1), batch T36184B, manufactured in August 2024 with an expiry date of August 2028; and Counterfeit Product (Type 2), batch 332, manufactured in March 2023 with an expiry date of February 2027, both carrying the registration number 04-6985.

It said that due to the potential presence of incorrect, substandard, or harmful ingredients, improper dosages of levonorgestrel, and a lack of sterile manufacturing conditions, poses significant risks to individual health and public safety.

Advertisement

The risks of administering falsified Postinor 2 (Levonorgestrel 0.75mg) include failure of contraceptive effect, toxic or harmful contaminants, unpredictable side effects, delayed or missed opportunity for genuine emergency contraception, and potential long-term reproductive health impact. Unexpected side effects: Unknown substances can trigger allergic reactions, organ damage, or death.

“Counterfeit medicines are unregulated, untested, and illegal, making their safety and efficacy impossible to guarantee. Patients should only obtain Postinor-2 from verified pharmacies or licensed healthcare providers.

READ ALSO:NAFDAC Warns Against VDM’s Inciting Video

Advertisement

Although Investigations are still ongoing regarding the source of the falsified product, all NAFDAC zonal directors and state coordinators have been directed to carry out surveillance and mop up the falsified product of type 1 and 2 postinor 2 (Levonorgestrel 0.75mg) within the zones and states,” it added.

NAFDAC urged consumers and healthcare providers to verify PIN stickers carefully, report suspected counterfeit products, and always purchase medications from reputable sources.

Advertisement
Continue Reading

Trending

Exit mobile version